Friday, May 29, 2009

finally a floor plan

The kitchen (top middle) and bedroom alcove (bottom right) are open to the living/dining area. The entry (top right) can double as a home office or extra sleeping space.  The total footprint is 782 square feet.  The space feels much larger due to the open plan and many windows.

solar evaluation

Danielle and Joe of GroSolar use their solar site selector to determine the best place for pole mounted pv panels.

finish grading and shower tile



The fiberglass window in the shower will withstand moisture.  The jambs around the window are stone to match the limestone tile.

Thursday, May 14, 2009

lighting

East and south facing windows bring in lots of light.  So much light comes in from the windows on all sides that electric light is not necessary during the day.  The suspended ceiling fixture casts light down and up where it is reflected off the wood ceiling.

Tuesday, April 14, 2009

wood stove


Earlier this year we selected a wood stove that we liked the looks of; it also fit our budget.  The price at the time reflected the fact that the stove was discontinued and would no longer be available in the U.S.  After much looking we have found what we were told is the last one in the country.  We look forward to installing the Scan 60 wood stove soon.

control joints


We cut control joints in the concrete slab at predetermined locations and at doorways  to eliminate cracking in other areas of the floor.  The close-up photos also show the variation in color.

Sunday, April 5, 2009

kitchen cabinets


The kitchen cabinets are installed and awaiting appliances. The 30" under counter refrigerator/freezer will be located on the right, the 24" range and hood on the left.  The post and beam frame the kitchen alcove and echo the posts and beams at the porch on the exterior. 

Wednesday, April 1, 2009

Tuesday, March 31, 2009

concrete floor






This morning Mike Frost of Vermont Eco Floors worked his magic with stain on the concrete floors.  Yesterday he ground and polished the concrete.

Sunday, March 29, 2009

trim



Both the interior and exterior window trim are narrow.  The ash trim on the inside frames the pine windows.  The red cedar trim on the outside frames the fiberglass cladding on the windows and together with the siding and roof overhang creates interesting shadows.  One interior wall will be clad in ash with a profile that mimics the exterior siding.

Wednesday, March 25, 2009

interior finish



Inside the concrete floors are protected while walls are painted and wood ceiling is installed.

deck framing





Last week Andrew and Dave framed the deck.  The framing cantilevers over the slope to the East and wraps around to the South side of the cabin.  The deck on the West side is covered by the roof.

Saturday, March 14, 2009

mud season

The siding has been completed and the drywall taping is in progress. The roads are posted so deliveries of materials need to be scheduled for cold mornings. Andrew will begin framing the deck next week.

Sunday, March 8, 2009

siding and radiant tubing




The radiant heat tubing and concrete slab are going in inside while Andrew and Dave put up the cedar siding on the exterior.